ADB funded Local Government Enhancement Sector Project (LGESP) –Additional Financing for Design and Supervision Consultancy (DSC – 3)  – Feasibility Study / Design and Construction Supervision of Subprojects Water Supply and Sanitation [ADB Funded]

The LGESP – additional financing has three outputs. Output 1 has been newly added for the additional financing.  

Output 1: Water supply systems in CKD-affected areas improved. The additional financing loan will finance development and expansion of water supply systems in CKD affected areas in the four provinces (Central, North Central, North Western, and Uva) to provide continuous supply of safe drinking water. The schemes include development of new water supply systems and expansion of existing systems, mostly run by NWSDB. Facilities such as raw water intakes, water treatment plants, overhead tanks, and transmission and distribution networks up to household connections are eligible for financing. About 30 schemes will be developed or expanded, and will be implemented by respective provincial councils with technical inputs and monitoring support from NWSDB. Considering the nature and complexity of the schemes, the piped-network will be operated by NWSDB, except a few local authorities who have adequate operational capacity. If local authorities are identified to be the appropriate entity to implement the subprojects, such local authorities will first have to submit a reform plan, as practiced in the original project, prior to the subproject implementation. Project management unit (PMU), through design and supervision cons ultants (DSCs), will provide capacity augmentation for construction supervision, NWSDB will provide Technical Assistance. 

 Output 2: Local infrastructure and basic service delivery improved. Social and economic infrastructure will be improved by newly participating local authorities. The

Eligible subprojects include (i) environmental infrastructure such as water supply and sanitation (including sewerage), drainage, and solid waste management; (ii) economic infrastructure such as roads and bridges (including suspension bridges); (iii) public health infrastructure such as maternity and health-care centers; and (iv) other local authority facilities such as public markets, child care centers, Montessori etc.

Some of the sub projects in the NWP are

  • Rural Water Supply Scheme Nikaweratiya, Ambanpola.
  • Rural Water Supply Scheme Karuwalagaswewa
  • Rural Water Supply Scheme Galgamuwa
  • Dambagirigama Drinking water Supply Project Narammala
  • Panangoda Drinking water Supply project Naththandiya
  • Mahilewa,Krus Wattha Drinking Water Project Naththandiya
  • Mundalama, Karathanwilluwa Drinking Water Project Puttalam
  • Supplying and Laying of Pipes for the Ibbagamuwa  Pradeshiya Sabha Areas
  • Supplying &Installation of Pumps and Accessories for Ibbagamuwa Pradeshiya Sabha Areas

Project Highlights

Country

Start date

March 2017

Completion date

March 2023

Origin of funding

Related Projects

Explore Other Related Projects

Explore Product By Sector & Service

Engineering Consulting