Additional Studies on Social Environment and Preparation of the Resettlement Action Plan Moragolla Hydropower Project

RDC was engaged to prepare two plans viz; Resettlement Action Plan (RAP) and Community Development Plan (CDP) after conducting the required studies. •    Prepare LSA Plan

The study team carried out extensive surveys of the designed area through questionnaire surveys and interviews and prepared the database. Photographs which were geo tagged were taken of all the directly and indirectly affected area. 

The surveys conducted included the following:

  1. Land owner survey
  2. Structure survey
  3. Resettlement survey
  4. Income survey
  5. Infrastructure survey and
  6. Culture survey downstream survey

A comprehensive data base with all cross references was prepared which could be used by the CEB for the implementation of the RAP. Based on the results of the survey the Resettlement Action Plan and the Community Development Plan were prepared

Project Highlights

Name of client

Country

Start date

April 2013

Completion date

October 2013

Origin of funding

N/A