Science and Technology Human Resource Development Project, Contract No: STHRD/PMU-CS 38 – Project Management Consultant for Supervision of Design and Construction – Faculty of Technology – Rajarata University of Sri Lanka

Construction of Technology Faculty Building Complex at Rajarata University of Sri Lanka (RUSL).There are two land lots for the civil works. The construction of buildings is for 5 departments including lecture theatres and lab complex, library, administrative block and collaborative cell, and cafeteria complex etc. The site development around the building includes the driveway, covered entrance drop off area, pedestrian walkways, water supply system including elevated water tank(s), service/delivery areas, generators and air conditioning/heating equipment area, waste disposal, landscaped green and open spaces, permanent perimeter fence, and parking area. Total floor area is approximately 23,000 square meters including circulation area, and end–user is Faculty of Technology, RUSL. The design-and-build contract duration is expected to be 913 calendar days.

Project Highlights

Name of client

Country

Start date

November 2021

Completion date

July 2024

Origin of funding

Related Projects

Explore Other Related Projects

Explore Product By Sector & Service

Engineering Consulting